7 things to check before signing a solar quote in France

Before you sign, seven simple checks that avoid most unpleasant surprises on a solar project in France.

A solar quote commits you for twenty years or more. Before signing, here are seven points to check, in the order we go through them with the homeowners we support.

1. Can the equipment be identified?

Brand, model and unit power of the panels, reference of the inverter or micro-inverters, type of mounting. If the quote talks about "high-efficiency panels" without a reference, ask for it. Without a reference, you can verify neither the specifications nor the manufacturer's warranties.

2. Does the system size match your consumption?

The proposed power (in kWc) should be explained by your yearly consumption, your habits and the roof area actually available. A system well above your needs produces a surplus that is exported, often at a tariff below the price of the electricity you buy. Ask how the size was determined.

3. What is the announced production based on?

A production estimate depends on orientation, tilt, shading and the calculation method. The quote (or the study that comes with it) should say so. A production figure with no assumptions is a sales number, not a forecast.

4. What is included in the price?

Check, line by line:

  • the planning declaration (déclaration préalable) at the mairie;
  • the grid connection request and its fees;
  • the electrical conformity certificate (Consuel);
  • commissioning and set-up;
  • the production monitoring system, if one is offered.

If it isn't written down, it isn't included.

5. Which warranties, and for how long?

Distinguish the panels' product warranty, their performance warranty, the inverter warranty (often shorter) and the workmanship warranty, particularly for the roof's watertightness. Ask for the contractor's insurance certificates covering the period of the works.

6. Do the grants mentioned really exist?

Support schemes change; conditions depend on your situation, the equipment and the contractor. Check on an official source, at the date of your project, before counting on any amount. Also look at whether the grant is deducted from the quote or paid later, and who handles the application.

7. Signing and payment terms

A large deposit, a signature demanded the same day, financing offered on the spot: these are signals that justify stepping back. A serious quote can be re-read calmly, compared and discussed. If you were approached at home, French law provides specific consumer protections — check official sources before committing.